Registration details
- Project name
- Lord Krishna Medlley
- RERA registration no.
- UPRERAPRJ639080
- Registration type
- New
- Registration date
- 22 Apr 2022
- Proposed start
- 01 Apr 2022
- District / tehsil
- Gautam Buddha Nagar302
- Project address
- Not stated on the register
- Record source
- up-rera.in
Completion timeline
The completion date declared at registration, and every extension recorded on the register since. Dates are as filed with UP-RERA; a recorded extension is a lawful entry, not a finding of fault.
Declared completion moved from 31 Mar 2025 to 31 Mar 2026 over 1 registered extension.
| # | From | To | Δ | Reason on record |
|---|---|---|---|---|
| 1 | 31 Mar 2025 | 31 Mar 2026 | +12mo | — |
| Net slip vs first declared date | +12mo | to 31 Mar 2026 | ||
About 54% of registered projects in this market run past their first promised date. A delay is common here, read it against the promoter's record.
Promoter track record
The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.
- Promoter
- Saviour Infra Private Limited
- Type
- Company
- Registered office
- C-110, sector-65 noida-201301
- Projects on the register
- 2
- Complaints · promoter-wide
- 33 (Under Registration - 0 )
- Complaints · this project
- 3filed against Lord Krishna Medlley
A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.
Documents on record
26 documents filed on the UP-RERA portal for UPRERAPRJ639080. Each opens on the official portal record.
Land, build & cost
Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
The build clock is running ahead of certified spend: 100% of the registered timeline has passed, but only 13% of the budget is certified spent. A gap worth asking the promoter about.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Location
Coordinates and site details as filed on the project's certificate. View the source certificate (PDF) →
- Coordinates
- 28.65516388, 77.41030555
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Structural engineer
- Prashant BhatiEngineer & Consultant
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Air conditioning
- DX System for shops, no split/window AC in retail area
- Lifts
- 3 lifts for shopping/food court (Otis/Schindler/Thyssen Krupp/Kone/Johnson)
- Escalators
- 5 escalators for shopping/food court, upper ground to 3rd floor, upward/downward (Otis/Schindler/Thyssen Krupp/Kone/Johnson)
- Electricity (Common Area)
- Corridor Lighting
- Electricity (Shops)
- One DB per shop, separate meter for power backup, main connection from NCPL by buyer
- DG Set
- As per load requirement
- Transformer
- As per load requirement
- Fire Fighting
- As per Fire NOC
- Staircase
- Granite/Marble Flooring (Sadarali/Black/Steel Grey/Equivalent)
- Parking (Basement)
- Trimix Concrete Flooring
- Common Parking
- As per drawings
- Ramp
- Trimix Concrete Flooring
- Soft Landscape
- Natural Grass/Artificial Grass pad/Shrubs/Plants/Trees
- Hard Landscape
- Tiles/Trimix Concrete/Pavers/Kerb Stone/Chequered Tiles
- Landscaping Lighting
- As per design
More from Saviour Infra Private Limited
Other projects nearby
Frequently asked
Is Lord Krishna Medlley RERA registered?
Yes. Lord Krishna Medlley is registered with UP-RERA under registration number UPRERAPRJ639080, registered on 22 Apr 2022.
Is Lord Krishna Medlley delayed?
Yes. It was declared for completion by 31 Mar 2025, but the date on record is now 31 Mar 2026, a slip of about 12 months across 1 registered extension.
Who is the developer of Lord Krishna Medlley?
Saviour Infra Private Limited, which has 2 project(s) registered with UP-RERA and 3 complaint(s) on record across its projects.
How many complaints are filed against Lord Krishna Medlley?
3 complaint(s) are recorded against Lord Krishna Medlley specifically on the UP-RERA portal.
Where can I verify Lord Krishna Medlley's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ639080. This page mirrors that public record for convenience.