Registration details
- Project name
- Arihant One
- RERA registration no.
- UPRERAPRJ723911
- Registration type
- New
- Registration date
- 28 Dec 2022
- Proposed start
- 01 Nov 2022
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- Not stated on the register
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.
- Promoter
- Arham Escon Pvt. Ltd.
- Type
- Company
- Registered office
- 601, 6th Floor, Sachdeva Tower Community Center, Karkardooma, Delhi-92
- Projects on the register
- 2
- Complaints · promoter-wide
- 00 (Under Registration - 0 )
- Complaints · this project
- 0filed against Arihant One
A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.
Documents on record
18 documents filed on the UP-RERA portal for UPRERAPRJ723911. Each opens on the official portal record.
Land, build & cost
Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
The build clock is running ahead of certified spend: 77% of the registered timeline has passed, but only 12% of the budget is certified spent. A gap worth asking the promoter about.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Location
Coordinates and site details as filed on the project's certificate. View the source certificate (PDF) →
- Coordinates
- 28.56425, 77.4487
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- VISHAL SHARMALicence CA/98/23281
- Structural engineer
- RAJANI GUPTAPrecision Valtech
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage treatment plant (STP) capacity
- 260 KLD
- DG Sets
- 1x 630 KVA (common services), 2x 500 KVA
- Compact Sub-Stations (CSS)
- 1x 630 KVA (common services), 2x 800 KVA (residential)
- HT Meters
- 2x 11 KV HT meters (reference & common services)
- Ring Main Unit (RMU)
- 1x 11 KV 3 Way RMU
- Fire safety system
- Yard hydrants, fire brigade connections (4-way & 2-way inlets), valves
- Underground water tanks
- Domestic: 170 KL, Fire: 300 KL (Total: 470 KL)
- Water supply lines
- Domestic, horticulture, flushing water supply lines
- Water source
- Tube wells with rising mains
- Rainwater harvesting
- System with desilting chamber and recharge pits
- Boundary wall
- Provided along the plot perimeter
- Internal roads
- 7.50m wide fire tender paths
- External road access
- 24.00m wide road
- Parks/Landscaping
- Horticulture and landscaped areas with dedicated water supply
Other projects nearby
Frequently asked
Is Arihant One RERA registered?
Yes. Arihant One is registered with UP-RERA under registration number UPRERAPRJ723911, registered on 28 Dec 2022.
What is the RERA completion date for Arihant One?
The completion date on record is 15 Sep 2027, with no extensions filed against the original commitment.
Who is the developer of Arihant One?
Arham Escon Pvt. Ltd., which has 2 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.
How many complaints are filed against Arihant One?
0 complaint(s) are recorded against Arihant One specifically on the UP-RERA portal.
Where can I verify Arihant One's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ723911. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the complaints, the paperwork behind Arihant One. Straight answers, before you sign anything.
Private line · no obligation