Registration details
- Project name
- Signature Park
- RERA registration no.
- UPRERAPRJ422327/10/2024
- Registration type
- New
- Registration date
- 08 Oct 2024
- Proposed start
- 06 Jun 2024
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- Plot no -INS- 02 , CHI -V , YAMUNA EXPRESSWAY , GREATER NOIDA , GAUTAM BUDH NAGAR , UTTAR PRADESH , PIN CODE -201310.
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.
- Promoter
- R.s. Resource Management Consulting Private Limited
- Type
- Company
- Registered office
- 326, MASTER MIND-1, ROYAL PALM, AAREY COLONY, GOREGAON (EAST) MUMBAI MH 400090 IN
- Projects on the register
- 1
- Complaints · promoter-wide
- 22 (Under Registration - 1 )
- Complaints · this project
- 1filed against Signature Park
A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.
Documents on record
20 documents filed on the UP-RERA portal for UPRERAPRJ422327/10/2024. Each opens on the official portal record.
Land, build & cost
Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
The build clock is running ahead of certified spend: 43% of the registered timeline has passed, but only 7% of the budget is certified spent. A gap worth asking the promoter about.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Location
Coordinates and site details as filed on the project's certificate. View the source certificate (PDF) →
- Coordinates
- 26.740664, 81.072929
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- SHYAM PRASADLicence COA/96/19721
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage treatment
- STP facility provided.
- Electric supply / transformers
- 5 x 2000 KVA Transformers, 3 x 2000 KVA DG Sets, 2 x 600 KVA DG Sets.
- Fire safety & staircases
- 80Ø Hydrant pipes from basement, 150Ø Fire Brigade Drawout Connection, 150MM DIA 4-way Fire Brigade Inlet for U.G. Tank.
- Water supply / tanks
- Domestic water riser pipes, Flushing water riser pipes, 40Ø Domestic water riser, Underground tank for fire brigade.
- Rainwater harvesting
- Boring 150mm Ø 18m deep system with overflow to main drain.
- Boundary wall
- 2.400 M HT. Boundary Wall, 1.100 M HT. Solid Wall and 1.000 M HT Railing (front).
- Roads
- 24.000 M wide external road, 6.000 M wide internal roads, 6.000 M wide ramps (slope 1:12 M).
- Water bodies
- Not specified.
- Parks
- 19555.116 SQM proposed landscape area, 1955 trees.
Other projects nearby
Frequently asked
Is Signature Park RERA registered?
Yes. Signature Park is registered with UP-RERA under registration number UPRERAPRJ422327/10/2024, registered on 08 Oct 2024.
What is the RERA completion date for Signature Park?
The completion date on record is 06 Jun 2029, with no extensions filed against the original commitment.
Who is the developer of Signature Park?
R.S. Resource Management Consulting Private Limited, which has 1 project(s) registered with UP-RERA and 2 complaint(s) on record across its projects.
How many complaints are filed against Signature Park?
1 complaint(s) are recorded against Signature Park specifically on the UP-RERA portal.
Where can I verify Signature Park's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ422327/10/2024. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the complaints, the paperwork behind Signature Park. Straight answers, before you sign anything.
Private line · no obligation