New No extensions UPRERAPRJ531916/06/2025

Nirala Gateway

by Parth Builtech Private Limited · Gautam Buddha Nagar

Completion on record
29 Apr 2030
Declared at registration · no extensions filed
Speak with an advisor
Nirala Gateway, project image
Builder marketing render via zricks.com, a promotional image, not a UP-RERA record.
Overview Land & costProgressLocationEscrowTeamDevelopment Promoter Documents FAQ
RERA number
UPRERAPRJ531916/06/2025
Gautam Buddha Nagar
Registered
17 Jun 2025
Type: New
Proposed period
60 mo
from 01 May 2025
Declared completion
29 Apr 2030
original commitment
Latest on record
29 Apr 2030
unchanged
Documents on portal
28
filed with UP-RERA
01

Registration details

Project name
Nirala Gateway
RERA registration no.
UPRERAPRJ531916/06/2025
Registration type
New
Registration date
17 Jun 2025
Proposed start
01 May 2025
District / tehsil
Gautam Buddha NagarGautam Buddha Nagar
Project address
Plot No. C-7
Record source
up-rera.in
02

Promoter track record

The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.

Promoter
Parth Builtech Private Limited
Type
Company
Registered office
G-83/207, Vijay Chowk, Laxmi Nagar, Delhi-110092 and Corporate office Address as Office No.21, Logix Infotech Park, Ground Floor, D-5, Sector-59, Noida-201301, Uttar Pradesh.
Projects on the register
2
Complaints · promoter-wide
22 (Under Registration - 1 )
Complaints · this project
1filed against Nirala Gateway

A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.

04

Land, build & cost

Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.

View the source certificate (PDF) →
Land area
2.57 ac
10,400 m²
Project size
1.0 bldgs
Floors
24.0
Project cost
₹402 Cr
construction ₹206 Cr
Cost incurred
₹68 Cr
17.0% of estimated cost
From allottees
₹0 Cr
collected to date
05

Construction progress

How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →

Certified spend17%
of the estimated project cost, certified spent to date
Build clock25%
of the registered build period elapsed
Physical build0%
of construction complete, per the engineer's certificate

Certified spend is broadly keeping pace with the build timeline.

A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.

06

Location

Coordinates and site details as filed on the project's certificate. View the source certificate (PDF) →

Coordinates
28.565344722, 77.477915
07

Bank account

The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →

Collection account
A/c no. 43842268337
08

Project team

The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →

Architect
Rajiv GandhiLicence CA/91/13852
Structural engineer
SANJEEV AGRAWALCSV Techno Services (P) Ltd.
09

Development & infrastructure

Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →

Sewage treatment (STP) capacity
Dedicated Sewage Treatment Plant (STP) installed
Electric supply / transformers
Electrical substation with transformers, HT/LT panels, DG sets, grid & backup power, street lights
Fire safety & staircases
Internal & external fire hydrant, sprinklers, fire detection & alarm system, fire staircase
Water supply / tanks
Water supply from Greater Noida Industrial Development Authority, Water Treatment Plant (WTP) installed
Rainwater harvesting
Rainwater harvesting chambers installed
Boundary wall
1.5m & 2.0m high brick boundary wall with permanent furnishing
Roads
7.5m wide internal cement concrete roads with pavers
Parks
Landscaped parks with trees, shrubs, ground covers, recreational areas, benches, walkways
12

Frequently asked

Is Nirala Gateway RERA registered?

Yes. Nirala Gateway is registered with UP-RERA under registration number UPRERAPRJ531916/06/2025, registered on 17 Jun 2025.

What is the RERA completion date for Nirala Gateway?

The completion date on record is 29 Apr 2030, with no extensions filed against the original commitment.

Who is the developer of Nirala Gateway?

Parth Builtech Private Limited, which has 2 project(s) registered with UP-RERA and 2 complaint(s) on record across its projects.

How many complaints are filed against Nirala Gateway?

1 complaint(s) are recorded against Nirala Gateway specifically on the UP-RERA portal.

Where can I verify Nirala Gateway's RERA details?

On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ531916/06/2025. This page mirrors that public record for convenience.

Want to go through this file before you commit?

Speak with an advisor who has actually read this file, the complaints, the paperwork behind Nirala Gateway. Straight answers, before you sign anything.

Speak with an advisor

Private line · no obligation