New No extensions UPRERAPRJ211439/02/2026

Levante Metro Walk

by Levante Projects · Dadri

Completion on record
30 Dec 2030
Declared at registration · no extensions filed
Speak with an advisor
Levante Metro Walk, project image
Builder marketing render via curlytales.com, a promotional image, not a UP-RERA record.
Overview Land & costProgressTeamDevelopment Promoter Documents FAQ
RERA number
UPRERAPRJ211439/02/2026
Gautam Buddha Nagar
Registered
18 Feb 2026
Type: New
Proposed period
60 mo
from 10 Jan 2026
Declared completion
30 Dec 2030
original commitment
Latest on record
30 Dec 2030
unchanged
Documents on portal
35
filed with UP-RERA
01

Registration details

Project name
Levante Metro Walk
RERA registration no.
UPRERAPRJ211439/02/2026
Registration type
New
Registration date
18 Feb 2026
Proposed start
10 Jan 2026
District / tehsil
Gautam Buddha NagarDadri
Project address
PLOT NO. C-8, SECTOR-DELTA-1, GREATER NOIDA, DISTRICT-GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Record source
up-rera.in
02

Promoter track record

The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.

Promoter
Levante Projects
Type
Partnership Firm
Registered office
14, THIRD FLOOR, MANAK VIHAR, DELHI-110092
Projects on the register
1
Complaints · promoter-wide
00 (Under Registration - 0 )
Complaints · this project
0filed against Levante Metro Walk

A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.

04

Land, build & cost

Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.

View the source certificate (PDF) →
Floors
18.0
05

Construction progress

How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →

Build clock11%
of the registered build period elapsed
Physical build0%
of construction complete, per the engineer's certificate

A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.

06

Project team

The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →

Architect
KAVI JAINLicence CA/88/11919
Structural engineer
Kavi JainNirman Consultant Pvt Ltd
07

Development & infrastructure

Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →

Electric supply / transformers
1 x 1600 KVA Transformer, 1 x 1600 KVA DG Set, HT Meter provided
Fire safety & staircases
Firefighting system with 100 KW load
Water supply / tanks
Total water storage 100,000 Liters, 300 mm dia water line
Rainwater harvesting
2 recharge pits (2.0m dia x 3.0m depth), total recharge volume 62.8 m³
Boundary wall
Provided around the plot
Roads
Adjacent road 106.00 M wide
Parks
962.08 sqm open area (10% of plot area), 20 trees
09

Frequently asked

Is Levante Metro Walk RERA registered?

Yes. Levante Metro Walk is registered with UP-RERA under registration number UPRERAPRJ211439/02/2026, registered on 18 Feb 2026.

What is the RERA completion date for Levante Metro Walk?

The completion date on record is 30 Dec 2030, with no extensions filed against the original commitment.

Who is the developer of Levante Metro Walk?

Levante Projects, which has 1 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.

How many complaints are filed against Levante Metro Walk?

0 complaint(s) are recorded against Levante Metro Walk specifically on the UP-RERA portal.

Where can I verify Levante Metro Walk's RERA details?

On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ211439/02/2026. This page mirrors that public record for convenience.

Want to go through this file before you commit?

Speak with an advisor who has actually read this file, the complaints, the paperwork behind Levante Metro Walk. Straight answers, before you sign anything.

Speak with an advisor

Private line · no obligation