Registration details
- Project name
- Dlf Techpark Noida
- RERA registration no.
- UPRERAPRJ720547
- Registration type
- New
- Registration date
- 01 Oct 2022
- Proposed start
- 06 Jan 2021
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- Not stated on the register
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.
- Promoter
- Urvasi Infratech Private Limited
- Type
- Company
- Registered office
- 12TH FLOOR, DLF GATEWAY TOWER, DLF CITY, PHASE-III NATIONAL HIGHWAY NO. 8 GURGAON 122002 HR
- Projects on the register
- 2
- Complaints · promoter-wide
- 00 (Under Registration - 0 )
- Complaints · this project
- 0filed against Dlf Techpark Noida
A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.
Documents on record
19 documents filed on the UP-RERA portal for UPRERAPRJ720547. Each opens on the official portal record.
Land, build & cost
Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- UJJAL KARLicence CA/2017/82316
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage treatment (STP) capacity
- MBBR STP provided for Data Centre and IT Block. Overflow connected to municipal sewerage system.
- Electric supply / transformers
- Centralized Transformer, HT/LT panels, Feeder Pillar, DG back for common services. Electrical system as per NBC Code/Local Electricity Board.
- Fire safety & staircases
- Fire Fighting and Protection system as per NBC Code. Fire staircase and refuse area for emergency evacuation.
- Water supply / tanks
- Treated water supply for Block A & B via WTP Plant Room.
- Rainwater harvesting
- Rainwater harvesting pit for ground water recharge, connected to storm water drainage. Overflow to municipal drain.
- Boundary wall
- 2400mm high boundary wall for Block A (600mm toe wall, 1800mm railing) and Block B (barbed wire above).
- Roads
- Minimum 6M wide driveways: concrete pavers for Block A, tremix for Block B.
- Parks
- Green areas, lawns, and multipurpose lawn planned along plot lines and buildings for Block A & B.
More from Urvasi Infratech...
Other projects nearby
Frequently asked
Is Dlf Techpark Noida RERA registered?
Yes. Dlf Techpark Noida is registered with UP-RERA under registration number UPRERAPRJ720547, registered on 01 Oct 2022.
What is the RERA completion date for Dlf Techpark Noida?
The completion date on record is 01 Apr 2024, with no extensions filed against the original commitment.
Who is the developer of Dlf Techpark Noida?
Urvasi Infratech Private Limited, which has 2 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.
How many complaints are filed against Dlf Techpark Noida?
0 complaint(s) are recorded against Dlf Techpark Noida specifically on the UP-RERA portal.
Where can I verify Dlf Techpark Noida's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ720547. This page mirrors that public record for convenience.