New No extensions UPRERAPRJ724518/07/2024

Crc Maesta

by Crc Homes Private Limited · Gautam Buddha Nagar

Completion on record
21 May 2029
Declared at registration · no extensions filed
Speak with an advisor
Crc Maesta, project image
Builder marketing render via images.moneycontrol.com, a promotional image, not a UP-RERA record.
Overview Land & costProgressEscrowTeamDevelopment Promoter Documents FAQ
RERA number
UPRERAPRJ724518/07/2024
Gautam Buddha Nagar
Registered
12 Jul 2024
Type: New
Proposed period
60 mo
from 01 Jun 2024
Declared completion
21 May 2029
original commitment
Latest on record
21 May 2029
unchanged
Documents on portal
20
filed with UP-RERA
01

Registration details

Project name
Crc Maesta
RERA registration no.
UPRERAPRJ724518/07/2024
Registration type
New
Registration date
12 Jul 2024
Proposed start
01 Jun 2024
District / tehsil
Gautam Buddha NagarGautam Buddha Nagar
Project address
PLOT NO.11B
Record source
up-rera.in
02

Promoter track record

The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.

Promoter
Crc Homes Private Limited
Type
Company
Registered office
Registered Office Address- SHOP NO. 111, VARDHMAN MAYUR MARKET KONDLI MAYUR VIHAR PHASE-III, DELHI 110096 Corporate Office Address- GROUND FLOOR, LOGIX TECHNO PARK SECTOR-127 NOIDA. 201301 Site Address- GH-8A TECHZONE-IV GREATER NOIDA WEST. 201306
Projects on the register
2
Complaints · promoter-wide
00 (Under Registration - 0 )
Complaints · this project
0filed against Crc Maesta

A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.

04

Land, build & cost

Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.

View the source certificate (PDF) →
Land area
3.65 ac
14,769 m²
Project size
5.0 bldgs
Floors
37.0
Project cost
₹406 Cr
construction ₹295 Cr
Cost incurred
₹91 Cr
22.3% of estimated cost
From allottees
₹0 Cr
collected to date
05

Construction progress

How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →

Certified spend22%
of the estimated project cost, certified spent to date
Build clock44%
of the registered build period elapsed
Physical build0%
of construction complete, per the engineer's certificate

Certified spend is broadly keeping pace with the build timeline.

A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.

06

Bank account

The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →

Collection account
A/c no. 003105043797
IFSC ICIC0000031
Branch K1 Senior Mall, Sector-18, Noida
07

Project team

The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →

Architect
VIKAS KUMAR GOELLicence CA/94/17889
Structural engineer
Dr. Maqsud E NazarNNC DESIGN INTERNATIONAL
08

Development & infrastructure

Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →

Sewage treatment
STP capacity: 250 KLD
Electric supply / transformers
1x 500 KVA CSS (EV charging), 1x 800 KVA CSS (common services), 2x 1250 KVA CSS (residential)
Fire safety & staircases
Yard hydrant system with 63mm dia. single headed hydrant valves, 9m wide fire tender access roads
Water supply / tanks
Underground tank: 200 KL domestic, 540 KL fire, total 740 KL
Rainwater harvesting
3 sets of desilting tanks (2.5x1.75x2m) and recharge pits (3.5x1.75x2m)
Boundary wall
Provided along project perimeter
Roads
24m wide main road, 12m wide side road, 7.5m wide internal driveway, 9m wide fire tender roads, 5.5m wide basement ramp
Water bodies
Swimming pool
Parks
Landscaped green areas with garden hydrants
09

More from Crc Homes Private Limited

Full promoter record →
11

Frequently asked

Is Crc Maesta RERA registered?

Yes. Crc Maesta is registered with UP-RERA under registration number UPRERAPRJ724518/07/2024, registered on 12 Jul 2024.

What is the RERA completion date for Crc Maesta?

The completion date on record is 21 May 2029, with no extensions filed against the original commitment.

Who is the developer of Crc Maesta?

Crc Homes Private Limited, which has 2 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.

How many complaints are filed against Crc Maesta?

0 complaint(s) are recorded against Crc Maesta specifically on the UP-RERA portal.

Where can I verify Crc Maesta's RERA details?

On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ724518/07/2024. This page mirrors that public record for convenience.